I am awaiting parts to finish many jobs, including the rewire but I am happy the major jobs needed before taking the boat out are now done. I have been doing a lot of odd jobs in the last couple of days, including putting up picture frames, cleaning,…
A big Atlantic storm has been blowing through the last few days but I am in a well protected spot here at the marina. I have been continuing with the rewire including the stern lights, interior lights and more work on the console. I have decided to get…
Including.. led nav lights at the bow and associated cabling tidied, anchor winch wiring tidied and new circuit breaker installed, new cabin radio fitted, lots more surplus wires removed, nav instruments now sharing data over seatalkng and nmea 2k which are now linked, spare main and jib stowed…
I have now got 10Mbs Internet on the boat. I am using a cheap Android mobile phone with a SIM on the 3 mobile network. It costs £20 per month for 50GB of data and if needed I can upgrade to unlimited data for another £12. This phone…
Apart from a two day break to return to New Quay, I have continued the boat rewire this week. Lots more old wires are out, the Bilge pumps nearly sorted (see below), nav and deck lights wired to the panels, all instruments are now in the new panel…
Today I started rewiring the nav lights and found they have used 2.5mm domestic cable up the mast!! OK that will have to stay for now but I have put waterproof connectors at the mast step and run new marine cable from there to the switch panel. If…